Waterproofing inspection in Werribee

Membranes in showers, bathrooms and balconies, checked after they have cured and before tiles hide them for good.

  • After the membrane has cured and before the tiler arrives
  • About 1 hour on site
  • Report within 24 hours
Request a Werribee quoteChoose the inspection, leave your details and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the membrane has cured and before the tiler arrives
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Werribee waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Werribee builds

On Werribee jobs we have found shower membranes torn by other trades, finished membranes left unprotected and a balcony with no membrane at all. Each would have been tiled over within days.

What we find at this stage in Werribee

  • Membrane damaged on shower floors
  • Balcony left without a membrane
  • Membrane exposed to foot traffic
  • Wet area waterproofing incomplete
  • Debris in the shower waste
Shower waste clogged with building debris that could block it later, found during a waterproofing inspection in Werribee
Shower waste clogged with building debris that could block it later
No confirmation that waterproofing runs behind the bathroom cabinets, found during a waterproofing inspection in Werribee
No confirmation that waterproofing runs behind the bathroom cabinets
Sample findings

Sample defects found during our waterproofing inspections in Werribee

Annotated findings from Waterproofing inspections.

Membrane damaged on the shower floor while other trades worked around it, found during a waterproofing inspection in Werribee
Membrane damaged on the shower floor while other trades worked around it
No waterproofing membrane on a balcony where one is mandatory, found during a waterproofing inspection in Werribee
No waterproofing membrane on a balcony where one is mandatory
Finished membrane left exposed to boots and tools before tiling, found during a waterproofing inspection in Werribee
Finished membrane left exposed to boots and tools before tiling
Wet area waterproofing unfinished at the point tiling was due, found during a waterproofing inspection in Werribee
Wet area waterproofing unfinished at the point tiling was due

The other stages of a Werribee build

  1. Bored piers inspection in Werribee1Bored piersAfter the holes are drilled and the cages set, before concrete goes in
  2. Slab pre-pour inspection in Werribee2Slab pre-pourOnce pods, steel and membrane are down, the day before concrete
  3. Frame inspection in Werribee3FrameWhen walls, trusses and roof cover are up, before any sarking or insulation hides them
  4. Lock-up (pre-plaster) inspection in Werribee4Lock-up (pre-plaster)With roof, windows, external doors and cladding on, before plasterboard
  5. Fixing inspection in Werribee5FixingWhen doors, skirtings and cabinetry are in, ahead of the painter
  6. Pre-handover (PCI) inspection in Werribee7Pre-handover (PCI)Roughly a week before the builder hands over the keys

All construction stage inspections in Werribee →

Guides

Construction stage guides for Werribee

All guides →

Book a waterproofing inspection in Werribee

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Werribee: common questions

Why inspect waterproofing separately?

Because once tiles go down the membrane cannot be seen, and a leak found later means removing the tiles to fix it.

Which standard covers wet area membranes?

AS 3740 for internal wet areas, together with the National Construction Code and the Guide to Standards and Tolerances 2015.

Is the shower flood tested at this visit?

No. We inspect the membrane visually for coverage, damage and detailing. Flood testing is a separate step the builder can arrange.

What about balconies?

A balcony over a room or with a tiled surface must be waterproofed. We check that a membrane is there and record any gaps at edges and outlets.

What if the membrane is damaged?

The applicator repairs it and the area is rechecked before tiling.

How much time does a membrane check in Werribee take?

Usually under an hour, depending on how many wet areas the home has.

CallGet a Free Quote